The Town of Port Hedland is seeking upgrades to the Gilbert Street Flood Pump Station to mitigate frequent flooding in the West End. This project involves mechanical plant and equipment upgrades to improve water pumping capacity. Site access and project commencement details are not specified in the tender summary.
The West End of Port Hedland frequently experiences flooding due to cyclonic storms and heavy rainfall. Floodwaters from Wilson Street and surrounding areas drain into a catchment adjacent to the existing pump station. As the West End sits below sea level, excess water must be mechanically pumped to Gilbert Street. Categories: Construction & Operation, Mechanical Plant, Equip, Services
Grab the documents from the source
Tender packs (the RFT, schedules and conditions) live on the agency’s own portal. Open the official listing and download them.
Open the source listingUpload them to Bindy
Drop the documents in (or paste the listing link) and Bindy reads every page — criteria, mandatory requirements, the lot.
Bindy writes your compliant bid
A full, structured response matched to exactly what the agency asked for — with a compliance checklist so nothing’s missed.
A free Bindy account unlocks the workflow that wins this tender — no credit card required.
WRKS0036 - Bendigo Library - Electrification